Hangzhou Metro Group Co., Ltd. Zhenning Road - Cooling Water Pump LQ-A1
1.Equipment Information
Equipment Type: Pump
Rated speed: 1465rpm
Measuring point associated with this case: Motor load end 2H
2.Alarm and Analysis Process
2022-07-10 07:15, a secondary alarm occurred at the motor load end 2H.
2.1Analysis Process
2.1.1Evidence Description of Trends, Index Parameters, etc.
The speed trend of the motor and pump end is slowly increasing.

Zhenning Road - Cooling Water Pump LQ-A1/Motor Load End 2H/16k Speed Waveform (2-1000)_Equipment Multi-Trend
The low-frequency trend at the motor load end is also slowly increasing.

Zhenning Road - Cooling Water Pump LQ-A1/Motor Load End 2H/128k Acceleration Waveform (0.1-2000)_Trend Analysis
2.1.2Time domain, spectrum, envelope demodulation and other evidence indicate
The velocity waveform is close to a sinusoidal shape.

Zhenning Road - Cooling Water Pump LQ-A1 / Motor Load End 2H / 16k Velocity Waveform (2-1000)_Time Domain Waveform
The velocity spectrum is mainly dominated by rotational frequency energy, accompanied by a small amount of harmonics.

Zhenning Road - Cooling Water Pump LQ-A1 / Motor Load End 2H / 16k Velocity Waveform (2-1000)_Spectrum Analysis
3.Diagnostic Conclusions and Recommendations
3.1Diagnostic Conclusions
2022-07-10 14:37 Pushed diagnostic conclusion: The unit's vibration is slowly increasing, speculated to be related to insufficient foundation stiffness or the operating status of the coupling, slowly deteriorating.
3.2Inspection and Maintenance Recommendations
The equipment is currently in a monitorable operating state. It is recommended to arrange an inspection when appropriate. Patrol inspections should focus on changes in motor and pump-end vibration and abnormal coupling operation noise, and check whether the foundation connection bolts are loose.
4.On-site Inspection and Maintenance Process
1.2022-08-16 09:43 Rongzhi Diagnosis engineer reminded the site to pay attention again. 2. 2022-08-17 17:04 Tracked the on-site feedback and overhauled and replaced the coupling elastic gasket.
5.On-site inspection and maintenance photos
Coupling gasket is worn and broken.

Coupling gasket wear fracture_1
6.Verification after inspection and maintenance
After the on-site repair of the coupling, the total speed value of each measuring point of the unit dropped significantly.

Zhenning Road - Cooling Water Pump LQ-A1/Motor Load End 2H/128k Acceleration Waveform (0.1-2000)_Equipment Multi-Trend
The amplitude of the velocity waveform decreases significantly.

Zhenning Road - Cooling Water Pump LQ-A1/Motor Load End 2H/128k Acceleration Waveform (0.1-2000)_Time Domain Waveform
The speed spectrum 1X frequency energy decreased significantly.

Zhenning Road - Cooling Water Pump LQ-A1 / Motor Load End 2H / 128k Acceleration Waveform (0.1-2000) _ Spectrum Analysis
7.Customer Feedback Form
None
8.Monitoring Fault Range
The timely and effective collection of equipment operating status data (vibration, temperature) is subject to network smoothness and data transmission time, and also needs to consider the interference of equipment attributes, production technology and other factors. At the same time, the analysis and diagnosis of equipment status is based on the change of vibration effect caused by the failure of rotating moving parts. Therefore, the condition monitoring system cannot guarantee to monitor all types of faults. The monitoring system is configured according to the measuring point scheme recommended by Party B, and the monitoring fault range and description are as follows:

9.Precautions
1. If the client of this report cannot provide basic unit parameters (such as: unit transmission chain diagram, gearbox structure diagram, number of gearbox teeth, related bearing models and brands), it will affect the accuracy of the analysis and diagnosis;
2. This report contains analyses, diagnoses, and maintenance recommendations for the unit provided by Roteon's professional technical personnel. It is for reference only, and the client should make its own decisions regarding specific maintenance and repair measures.
3. This report shall not be used as evidence for any claims, lawsuits, or other legal proceedings;
4. The client is obligated to keep the analysis report confidential and shall not provide this report to any third party, print it into other promotional materials, or publish it on public information platforms such as the internet without the written permission of the trustee.